Who’s left: The 747-400 Backlog

With last week’s announcement of the 747-8 delay, got me to thinking. Just how many 747-400s are left to be delivered? Boeing originally intended to build 747-400s and 747-8s side by side on the production line in Everett, but decided a year ago to close out the -400 line before launching -8 assembly.
remaining747.jpg

The last passenger -400 was delivered to China Airlines back in April 2005, leaving nine 747-400 freighters left for delivery.

After poking around a bit and triangulating some data, the remaining nine will go to four cargo operators: UPS (1), Nippon Cargo Airlines (2), Cathay Pacific (4) and LoadAir Cargo (2) of Kuwait. UPS and NCA will receive -400Fs and CX and LoadAir will receive -400ERFs.

The final -400, an Extended Range Freighter, is destined for LoadAir and will be the 1419th 747 built since 1968.

This post was originally published to the internet between 2007 and 2012. Links, images, and embedded media from that era may no longer function as intended.

This post originally appeared at Flightglobal.com from 2007 to 2012.