Assembling 747-8 – May 19 – Flying forward fuselage

RC501-Sec41_900.jpg

The forward fuselage for Boeing’s first 747-8F – RC501 – made its maiden…er, flight on the evening of May 17th, taking it from the final assembly installation tool in Building 40-23 back over to 40-21/22 for sealing and testing before beginning systems installation in the coming weeks.

Photo Credit Boeing

This post was originally published to the internet between 2007 and 2012. Links, images, and embedded media from that era may no longer function as intended.

This post originally appeared at Flightglobal.com from 2007 to 2012.