March 27, 2009:
Embraer to decide on larger aircraft within 18 to 24 months
Embraer expects to decide whether to move forward with development of a larger commercial aircraft within the next 18 to 24 months.During an earnings conference call today, Embraer president and CEO Frederico Fleury Curado said: “We keep looking into the whole section of commercial aircraft [from] small to 150 seats or so.”
Embraer in engine talks as it studies clean-sheet airliner
Embraer is talking to General Electric, Rolls-Royce and Pratt & Whitney about new-generation engines to power a potential clean-sheet airliner design under study which is larger than the E-Jet family, a top Embraer official reveals.
…
However, while P&W “started this race with the geared turbofan, and GE and Rolls are very seriously looking at new technology for a new generation engine”, Embraer does not see “enough maturity to make a decision at this point”, says Kern, adding: “Maybe in 18 to 24 months we’ll have a better, more clearer view about that.”
Proposed stretch dubbed E-195X by Embraer
A proposed stretch of Embraer’s largest-capacity commercial jet has been dubbed the E-195X by the manufacturer, which expects to decide whether to launch the variant – or potentially another type – by mid-2011.
…
Embraer’s “best estimate” is that it will have a decision on whether to launch a new derivative or programme in “12 to 18 months”, by the mid-2011 timeframe.
March 15, 2010:
Embraer outlines timeframe for new product decision
Embraer expects to make a decision on product enhancements or a new commercial aircraft in 12-18 months.
Company EVP of the airline market Mauro Kern outlined that timeframe during the ISTAT annual conference today in Orlando, Florida, stating the time period to make a decision “could be shorter than that”.
Embraer to decide on new jet in 12-18 months-report
(Reuters) – Embraer (EMBR3.SA)(ERJ.N), the world’s biggest regional aircraft maker, will take more than one year to decide whether to build a new family of jets, Chief Executive Officer Frederico Curado told newspaper Valor Economico on Wednesday.“We have to make a decision in the short to medium term, and that would be something between 12 and 18 months,” Curado told Valor. The Sao Jose dos Campos, Brazil-based company is a global leader in 70-to-120-seat aircraft.
This post was originally published to the internet between 2007 and 2012. Links, images, and embedded media from that era may no longer function as intended.
This post originally appeared at Flightglobal.com from 2007 to 2012.
