GEnx-1B PIP1 Certified
This post was originally published to the internet between 2007 and 2012. Links, images, and embedded media from that era may no longer function as intended.
This post originally appeared at Flightglobal.com from 2007 to 2012.
GEnx-1B PIP1 Certified
This post was originally published to the internet between 2007 and 2012. Links, images, and embedded media from that era may no longer function as intended.
This post originally appeared at Flightglobal.com from 2007 to 2012.
This post was originally published to the internet between 2007 and 2012. Links, images, and embedded media from that era may no longer function as intended.
This post originally appeared at Flightglobal.com from 2007 to 2012.
Boeing announced this morning that the 747-8 freighter has been certified by both the US Federal Aviation Administration and European Aviation Safety Agency, clearing the final hurdle before the first aircraft is turned over to Cargolux early in September. Here’s my full story on the certification.
This post was originally published to the internet between 2007 and 2012. Links, images, and embedded media from that era may no longer function as intended.
This post originally appeared at Flightglobal.com from 2007 to 2012.
This post was originally published to the internet between 2007 and 2012. Links, images, and embedded media from that era may no longer function as intended.
This post originally appeared at Flightglobal.com from 2007 to 2012.
Boeing has confirmed Saturday’s 787 flight test completion.
And now your moment of Zen:
This post was originally published to the internet between 2007 and 2012. Links, images, and embedded media from that era may no longer function as intended.
This post originally appeared at Flightglobal.com from 2007 to 2012.
Earlier this month, the last parts for United Airlines’ (formerly Continental Airlines) first 787 arrived at Boeing’s Everett, Washington facility to begin final assembly. The aircraft’s center fuselage arrived at Paine Field aboard the Dreamlifter just before All Nippon Airways first 787 was unveiled on August 6, and the forward fuselage arrived from Wichita on August 4.
This post was originally published to the internet between 2007 and 2012. Links, images, and embedded media from that era may no longer function as intended.
This post originally appeared at Flightglobal.com from 2007 to 2012.
This post was originally published to the internet between 2007 and 2012. Links, images, and embedded media from that era may no longer function as intended.
This post originally appeared at Flightglobal.com from 2007 to 2012.
This post was originally published to the internet between 2007 and 2012. Links, images, and embedded media from that era may no longer function as intended.
This post originally appeared at Flightglobal.com from 2007 to 2012.
From a production ramp up point of view, this fits well into Airbus’s Red modus operandi within the Piepenbrock framework. The production system doesn’t reinvent the wheel, but takes the existing beluga design and adapts it for an aircraft that already has a fuselage the same width as the A300-600.
This post was originally published to the internet between 2007 and 2012. Links, images, and embedded media from that era may no longer function as intended.
This post originally appeared at Flightglobal.com from 2007 to 2012.
This post was originally published to the internet between 2007 and 2012. Links, images, and embedded media from that era may no longer function as intended.
This post originally appeared at Flightglobal.com from 2007 to 2012.